Production Kitchen Upgrades? - Dalata Hotel Group - The Clayton Hotel

KCCJ Limited

KCCJ Limited

Standard Supplier 13th June 2018
KCCJ Limited

KCCJ Limited

Standard Supplier

Production Kitchen Upgrades? - Dalata Hotel Group - The Clayton Hotel

Is your production kitchen in need of some upgrades.....?

For the third time in the last 12 months, KCCJ have been called upon to assist with the refurbishment of another area of the production kitchen within Leeds’ largest hotel (Dalata Hotel Group - The Clayton Hotel).

A chilled prep area was replaced in 2017 followed by a large dishwash facility. In 2018 the old island cooking suite was removed and replaced with a range of Falcon F900 equipment. At the same time, upgrades to the extraction and supply air systems including new fans were also made.

Check out KCCJ for more information:
www.kccj.co.uk
Tel: 01322 291 188
Email: [email protected]
Twitter: @KCCJLTD

Built by Chefs. Powered by You.

For 18 years, The Staff Canteen has been the meeting place for chefs and hospitality professionals—your stories, your skills, your space.

Every recipe, every video, every news update exists because this community makes it possible.

We’ll never hide content behind a paywall, but we need your help to keep it free.

If The Staff Canteen has inspired you, informed you, or simply made you smile, chip in £3—less than a coffee—to keep this space thriving.

Together, we keep the industry connected. Together, we move forward.